“Pelaksanaan Pemeliharaan Rutin Belt Conveyer untuk Meminimalkan Downtime pada UBP PLTU Jeranjang” (2025) JEITECH (JOURNAL OF ELECTRICAL ENGINEERING, INFORMATION TECHNOLOGY, CONTROL ENGINEERING, AND ROBOTIC), 3(2), pp. 25–31. Available at: https://jurnal.unram.ac.id/index.php/jeitech/article/view/8145 (Accessed: 15 October 2025).